All case studies
Honda Motor Co.

Procurement

Honda: give every part a second source

Split purchasing so no part that can stop a vehicle line depends on one supplier.

By OneShot · Updated

impact of one single-sourced chip
¥150bn
fewer units built in North America
110,000
day its Mexico plant was halted
Oct 28

The documented problem

Honda said a chip from a single supplier stopped shipping in October 2025, halting its Mexico plant and cutting North American output.

What Honda Motor Co. has published 2 sources

On November 7, 2025, Honda told analysts that export restrictions had stopped shipments of a semiconductor used in its components since early October. Its plant in Mexico had been halted since October 28, and plants in the United States and Canada had cut daily output. Honda put the reduction at 110,000 units in North America and the impact of the shortage at minus 150 billion yen.

“The semiconductor in question was sourced from a single company,” an executive said. Honda had held intermediate stock for single-source parts since an earlier shortage, but said that using the same parts across many models left it short once supply stopped. It said it aims to “avoid single-source arrangements as much as possible” and to work out, part by part, how long an alternative takes to procure. On February 10, 2026, it said it had established a clear path toward preventing a recurrence. These are Honda’s own statements. The OneShot workflow below re-splits purchasing so no part that can stop a line rests on one supplier.

The OneShot solution

Give every part that can stop a line a second qualified source, or stock that lasts until one is qualified.

Starts on

A part found to have one supplier, a disruption at a supplier or a new model that shares a single-sourced part.

  1. Find the single points

    Read every part with its suppliers, the models and plants that use it, stock on hand and each supplier’s production site. List the parts with one supplier, ranked by the vehicles that stop without them.

    • Supplier site and part records
    • Part sourcing records
  2. Find and check second sources

    Search for other makers of each listed part and profile them. Confirm each company’s legal entity and filings and screen it against sanctions lists, then ask each candidate supplier by email for capacity, lead time, price and the time to qualify its part.

    • Company Find
    • Company Profile
    • Legal Entity Identifier
    • Company Filings
    • Sanctions Listing (company)
    • Email
    • Email Inbox
    • Part sourcing records
  3. Solve the split

    The OneShot agent uses its optimization tool to split each part’s volume between suppliers at the lowest total cost, within each supplier’s capacity and with no supplier above the share the purchasing manager sets. Parts with no second source that can qualify in time are listed for a stock decision.

    • Solve
    • Part sourcing records
  4. Get the split approved

    Give the purchasing manager the proposed split, its cost against single sourcing and the stock needed for each part still on one supplier. Record the decision per part and the date to review it.

    • Part sourcing records
  5. Place the change

    Ask engineering through the goal’s private request page to qualify each second source, and chase each qualification to a date. Once a source qualifies, email the approved volumes to both suppliers and record the split in purchasing.

    • Email
    • Email Inbox
    • Part sourcing records
    • Supplier and purchasing records

What the workflow produces

Part sourcing plan
  • Single points
  • Second sources
  • Split
  • Decision
Pays back
Vehicles built through a supplier stoppage
Decided by
Purchasing manager for the commodity
Done when
Every part that can stop a line has a qualified second source with volume on order, or an approved stock level that lasts until one qualifies.

Where a person decides

  • A new supplier goes through engineering qualification before it gets volume.

  • A sanctions or name match goes to compliance before anyone contacts the supplier.

  • A part kept on one supplier for cost or technical reasons is recorded with the stock that covers it.

What to measure

  • Line-stopping parts with one supplier
  • Days of production covered per part
  • Time to qualify a second source
  • Cost of the split against single sourcing

The agent’s tools

  • Company Find
  • Company Profile
  • Legal Entity Identifier
  • Company Filings
  • Sanctions Listing (company)
  • Email
  • Email Inbox
  • Solve
  • Supplier site and part records
  • Part sourcing records
  • Supplier and purchasing records

Live toolConnection to your systems

What each connection does
Supplier site and part records
Read active suppliers, each production site address, the parts it supplies, stock cover and approved alternates; record the category manager’s decision and recheck date.
Part sourcing records
Read each part’s suppliers, volumes, unit prices and the models and plants that use it; record the approved split per supplier and qualification dates.
Supplier and purchasing records
Read eligible suppliers and approved commercial boundaries; record buyer-approved terms.

Workflow pricing

Scope the full workflow around your volume, business systems and required outcome.

Discuss workflow pricing →

Bring a workflow